-
2024-12-03
On December?3,CNOOC Limited announced?that Jinzhou 23-2 Oilfield Development Project has commenced production.?The project is located in the northern part of the Bohai Sea, with an average water depth of approximately 13 met...
-
2024-12-02
On December 2, CNOOC Limited announced?that Huizhou 26-6 Oilfield Development Project has commenced production.The project is located in the Pearl River Mouth Basin, with an average water depth of approximately 110 meters. The...
-
2024-11-07
On November?6, CNOOC Limited announced?that Long Lake Northwest Project in Canada has commenced production safely.The project is?located in Alberta, Canada. The main production facilities include a new well pad and 4 pipelin...
-
2024-11-01
On October 31, CNOOC Limited announced that Mero3 Project has commenced production safely.Mero field is located in the Santos Basin pre-salt southeastern offshore Brazil, about 180 kilometers away from Rio de Janeiro, in a wate...
-
2024-10-30
On October?30, CNOOC Limited?announced?its wholly owned subsidiary, CNOOC Africa Holding Ltd., has entered into the Exploration, Development & Production Contract (EDPC) with Midland Oil Company (Md.O.C) for Block 7 in the R...
-
2024-10-29
On October 28, CNOOC Limited announced?its operating results for the third quarter of 2024.In the first three quarters of 2024, CNOOC Limited continued to increase its reserves and production, while effectively controlling cos...
-
2024-10-22
On October 22, CNOOC Limited announced?that Xijiang 30-2 Oilfield Xijiang 30-1 Block?Development Project commenced production ahead of schedule.The project is located in eastern South China Sea, with an average water depth of...
-
2024-10-17
On October 17, CNOOC Limited’s wholly owned subsidiary, CNOOC Petroleum Brasil Ltda, has entered into 4 Concession Contracts for exploration blocks offshore Brazil with the Brazilian National Agency for Petroleum and the partn...
-
2024-10-08
On October 8, CNOOC Limited announced that Bozhong 19-2 Oilfield Development Project has commenced production.The project is located in central Bohai Bay, with an average water depth of about 20 meters. The main production faci...